Alley No. 42 Reconstruction

Final Project Update: May 17, 2021


As part of the City’s Alley Reconstruction program, Alley #42 (Bordered by:  Grand, Frame, Garfield, Wabash) will be reconstructed in 2021. 

 

Work Completed This week (5/10 – 5/14)

  • HMA driveway replacements along both alley segments
  • Topsoil and restoration of disturbed areas

 

Planned Work (Future Weeks)

  • Any punch list work required for project closeout

 

Traffic Control/Access

  • Alley 42 was re-opened to vehicular access on 5/14

 

This will be the final update for the project.  If you have any questions or concerns please feel free to contact me. 

Alley 42 is bounded by Grand Ave, Frame Ave, Garfield Ave. and Wabash Ave.

Project Update May 7, 2021

As part of the City’s Alley Reconstruction program, Alley #42 (Bordered by:  Grand, Frame, Garfield, Wabash) will be reconstructed in 2021. 

 

Work Completed This week (5/3 – 5/7)

  • Alley driveway entrance apron and sidewalk along Garfield Ave. poured
  • Alley driveway entrance apron and sidewalk along Frame Ave. poured
  • Concrete driveway aprons completed along both alley segments
  • HMA driveway apron prep work completed

 

 

Planned Work Next Week (5/10 – 5/14)

  • HMA driveway replacements along both alley segments
  • Topsoil and restoration of disturbed areas

 

Traffic Control/Access

  • Alley 42 is closed to all vehicle access.
  • Once concrete cure time is achieved, the alley will be re-opened to traffic/vehicles access.  This may be mid-late next week

.

 

All the dates and times above are subject to change and are weather dependent.  I will update the group if anything changes from the above information.  If you have any questions or concerns regarding the project, please feel free to contact me. 

 

Project Contact

Brandon Schweenn, P.E.
Project Engineer
262-524-3585